IN-HOUSE MANUFACTURE | CLEANROOM | ENCLOSURES
PROFILES
The connecting profile provides channelling for power lines for sockets, switches and voice and data. These profiles are built in between the partitions, serving as a support and avoiding false elements.
The angular joints between walls, ceiling and floor are built with extruded, lacquered or anodised aluminium profiles with various curve radii to ensure perfect integration with the ceiling and floor.
Extruded and cast aluminium profiles for finishes and internal structures.
Description
To obtain flush systems, the panels are joined with hidden aluminium profiles of a special design. The resulting joints are sealed with silicone putty with fungicide properties to ensure the continuity of the surface.
Innovation! Anti-bacteria coating for Clean Room profiles.


On this occasion, the incessant dialogue between innovation and the needs of our clients allows us to present an innovative application for the architecture of sterile areas.
Clean-Concept has developed a new system of aluminium profiles for finishes in clean rooms that can be supplied optionally with an anti-bacteria coating based on the protective activity of silver ions (Ag+).
Tests and studies carried out have shown the effectiveness of silver ions in reducing microbe growth by more than 99%. Their protective activity is permanent while the coating is conserved and covers a wide range of micro-organisms such as bacteria (S. Aureus, K. Pneumoniae, E. Coli, C. Albicans, P. Aeruginosa, S. Epidermidis, L. neumophila, etc), fungi (mould, yeast) and algae..
The coating is a colloidal solution that forms a uniform layer that resists cleaning and washing.
Main advantages
Careful finishing and sealing, completely hygienic
Perfect integration with floor and ceiling.
Solicitar más información
Projects
Facilities for a company focused on the production of DNA for advanced therapies
Turnkey project executed in several phases with excellent coordination and compliance with deadlines.
Autovaccine production plant
Complete project adapted to the security and containment needs of the client.
News
Contamination Control Strategy (CCS): Achieving True Technical Integration within the GMP Annex 1 Framework
The implementation of the CCS under the new GMP Annex 1 has evolved from a mere documentation exercise into the actual architecture of aseptic manufacturing. At Albian Group, we transform this regulatory requirement into a robust engineering solution that ensures operational excellence. Our goal is to shield process integrity to protect what matters most: patient safety.
Pharmaceutical Competitiveness 2026: How to Transform Regulatory Compliance into an Operational Advantage
In a globalized market where energy costs, regulatory demands (Annex 1), and time-to-market...
